Project Overview
Fiber optic runs installed between telecom rooms, then spliced, terminated and tested to connect the building backbone.
Challenge and Solution
Fiber links have to be right the first time, because a bad splice or dirty connector can take down an entire floor. We install, splice and terminate carefully, then test each link and document the results.
- Run fiber between telecom rooms and floors
- Splice and terminate to spec
- Test every link and record results
- Label and document the backbone
Frequently Asked Questions
Fiber is best for runs longer than 100 meters, between floors or buildings, and anywhere electrical interference is a concern.
Yes. Every link is tested and the results are documented.
Yes. We install and test fiber for building backbones and telecom handoffs.